Cob building with Maya
  • • What is cob?
  • ALL PROJECTS SUMMARY
  • Spring 2022
  • NEWEST IDEA F/650 SQ.' HOUSE. NOV.2021
  • • Pandemic project phase 1: Earthen oven
  • Pandemic Project phase 2 & 3: Bench & Roof
  • Pandemic Project Phase 4: Pajareque wall
  • Pandemic Project Phase 5: Solarium
  • Pandemic Project Phase 6: January 2021
  • Pandemic Project Phase 7: Rocket Mass Heater
  • Pandemic Project Phase 8: Cob/adobe floor
  • Pandemic Project Phase 8 : Plastering
  • Pandemic Project: November 2021 SOLARIUM MOSTLY DONE
  • • Cob wall: first project
  • • I. "ATV Shed": Rural building SITE & DESIGN
  • II. "ATV Shed": STONE PIERS & COB LIZARD BENCH
  • III. "ATV Shed": SUMMER 2012 STONE FOUNDATION STEM WALL
  • IV. "ATV Shed" spring 2013 STONE COMPLETE
  • V. "ATV Shed" SUMMER 2013 WINDOW PREP/COB WALLS BEGIN
  • VI. "ATV Shed" Fall 2013
  • VII. "ATV Shed" SUMMER 2014 SETTINNG WINDOW FRAMES
  • VIII. "ATV Shed" Summer 2015 FAMILY HELP
  • IX. "ATV Shed" Fall 2015 GOT ROOF
  • X. "ATV Shed" Spring 2016
  • XI. "ATV Shed" Summer 2016 PORCH TIMBER WORK
  • XII. "ATV Shed" Fall/winter 2016 STUCCO TESTS
  • XIII. "ATV Shed" Spring 2017 FINISHING COB WALLS
  • XIV. "ATV Shed": Summer 2017
  • XV. WALLS DONE! "ATV Shed" PORCH ROOFING f17
  • XVI. "ATV Shed" Winter 2018
  • XVII. "ATV Shed" SUMMER 2018 EXTERIOR COMPLETE W/STUCCO
  • XVIII. "ATV Shed" SU18 INTERIOR WORK
  • XIX. Late summer STUCCO DETAILS
  • XX. "ATV Shed" NORTH WALL INSULATION
  • XXI. "ATV Shed" fall 2018 CEILING INSULATION
  • XXII. "ATV Shed" 2020 Where it's at now
  • XXIII. "ATV Shed" 2021
  • • Cob Chicken Coop
  • • CSU-Pueblo Bench Spring 2019
  • • Mud Mural Workshop WITH KIKO DENZER
  • • Cob Mailbox
  • • Cob Oven at Pueblo Music House
  • • Rough Timber Frame Shed
  • • Cob bench workshop WITH ANNE FROBEEN
  • • Horticulture
  • • Mountain Park Environmental Center Fire Circle Benches
  • • Xeriscape garden
  • • Ecohouse model
  • • Natural Building on show
  • • Nature, art, fun and other photos
  • Info about Maya

January 2021

Since I can't cob or do plaster now, I've been working on various other things:
– Got masonry done on the little table/footrest in front of the bench; stained stones w/wash of red clay & masonry tint.
– Made cushions for the bench; used the outdoor cloth tarp I'd made to protect everything before roof was done.
– Got repurposed gutters in, the last one being a bent length of roof panel; goes to water catchment for garden.
– Got flashing in between studio roof & natural building roof.
Picture
Picture
Picture
Picture
Finally got an okay photo after getting gutter up. Cob oven, bench for afternoon sunning on the left, pajareque wall above middle window, repurposed roofing, roof structure supported with logs Jen D. & I harvested on the mountain & I built. Solarium on the right windows repurposed from my colleagues (needs interior finishing & rocket stove).
- 8 truckloads: 9,000lbs. of sand.
- cost total: $700 for screws, hay bales, flagstone, roofing insulation, perlite, silicon, quikcrete, repurposed door.