Cob building with Maya
  • • What is cob?
  • ALL PROJECTS SUMMARY
  • Spring 2022
  • NEWEST IDEA F/650 SQ.' HOUSE. NOV.2021
  • • Pandemic project phase 1: Earthen oven
  • Pandemic Project phase 2 & 3: Bench & Roof
  • Pandemic Project Phase 4: Pajareque wall
  • Pandemic Project Phase 5: Solarium
  • Pandemic Project Phase 6: January 2021
  • Pandemic Project Phase 7: Rocket Stove
  • Pandemic Project Phase 8: Cob/adobe floor
  • Pandemic Project Phase 8 : Plastering
  • Pandemic Project: November 2021 SOLARIUM MOSTLY DONE
  • • Cob wall: first project
  • • I. "ATV Shed": Rural building SITE & DESIGN
  • II. "ATV Shed": STONE PIERS & COB LIZARD BENCH
  • III. "ATV Shed": SUMMER 2012 STONE FOUNDATION STEM WALL
  • IV. "ATV Shed" spring 2013 STONE COMPLETE
  • V. "ATV Shed" SUMMER 2013 WINDOW PREP/COB WALLS BEGIN
  • VI. "ATV Shed" Fall 2013
  • VII. "ATV Shed" SUMMER 2014 SETTINNG WINDOW FRAMES
  • VIII. "ATV Shed" Summer 2015 FAMILY HELP
  • IX. "ATV Shed" Fall 2015 GOT ROOF
  • X. "ATV Shed" Spring 2016
  • XI. "ATV Shed" Summer 2016 PORCH TIMBER WORK
  • XII. "ATV Shed" Fall/winter 2016 STUCCO TESTS
  • XIII. "ATV Shed" Spring 2017 FINISHING COB WALLS
  • XIV. "ATV Shed": Summer 2017
  • XV. WALLS DONE! "ATV Shed" PORCH ROOFING f17
  • XVI. "ATV Shed" Winter 2018
  • XVII. "ATV Shed" SUMMER 2018 EXTERIOR COMPLETE W/STUCCO
  • XVIII. "ATV Shed" SU18 INTERIOR WORK
  • XIX. Late summer STUCCO DETAILS
  • XX. "ATV Shed" NORTH WALL INSULATION
  • XXI. "ATV Shed" fall 2018 CEILING INSULATION
  • XXII. "ATV Shed" 2020 Where it's at now
  • XXIII. "ATV Shed" 2021
  • • Cob Chicken Coop
  • • CSU-Pueblo Bench Spring 2019
  • • Mud Mural Workshop WITH KIKO DENZER
  • • Cob Mailbox
  • • Cob Oven at Pueblo Music House
  • • Rough Timber Frame Shed
  • • Cob bench workshop WITH ANNE FROBEEN
  • • Horticulture
  • • Mountain Park Environmental Center Fire Circle Benches
  • • Xeriscape garden
  • • Ecohouse model
  • • Natural Building on show
  • • Nature, art, fun and other photos
  • Info about Maya

October 20, 2018

After a super cold snap earlier in October that dropped all the leaves from the Catalpas in town, the days have warmed up again and importantly, nights will be above freezing...so...on Saturday we got in a day of firewood gathering/forest fire mitigation (also path aeration) & then yesterday Jen D. stomped cob which I used to get the second step to the loft cobbed in while she finished the exterior lime stucco!!!! She has become plasterer extraordinaire!
Picture
Picture


Below: This shows the system I figured out to put 5" of fiberglass insulation in the ceiling but then add reflectix bubble insulation to increase the R-value. The rafters are 4.5-6" in diameter, but there needs to be a breathing space above insulation; so I made spacers out of plywood. Temporary string holds insulation in place. What isn't in place here yet are sheets of canvas re-purposed from a digital photo lab which will cover the bubble reflectix. Cedar boards go between spacers and bamboo sits on those to hold the whole shebang up.
A piece of cement board is above where the rocket stove feed tube is.
Picture